Plaster Started and finished


29th July 2015

This weeks update from our CSC Plaster has started, bricks and lower roof are finally completed, scaffolding has come down, and cladding is due late next week followed by rendering, and painting. pics to follow.











10 weeks in....Raining again.

22nd July

We are 10 weeks in, and are delayed by the rain AGAIN....... arrrrghhh.

Spoke to our SS, he has said that the rain this week has delayed the lower roof going on, and the bricks will not be completed until the end of the week, which has pushed the plastering out.... all in all though we are happy with how much has been accomplished in the last 10 weeks and CANNOT wait until we are completly water proof, and no longer need to study the weather forecasts!
Update.... lower roof almost complete and then delayed again as there are not enough tiles.







 

Bricks Start!

16th July

SS notified that bricks and insulation has started..YAY! lower roof will be going on shortly (was not completed with main roof as somone damaged tiling items and they have had to wait for new supplies), followed closely by plastering.







Furniture Shopping

July 2015

While we were in QLD we did some of our furniture and light fitting shopping.  We got a lot of it from Freedom.










exterior lights

pendant lights over kitchen island

Rug for lounge room

Media room couch

Living room couch

Master Bed

mirror to go horizontally in dining room over buffet






Meeting our house for the first time

1st July
 
We made a quick visit to QLD to visit the house, which was great. Progress was where we thought it would be. The rooms looked and felt much different in person than what we have been looking at on the plans. We had an independant inspector from KSpec come and do his insopection, he found a few minor defects, and a missing structural beam which was a tad concerning, but the Site Supervisor advised all would be completed this week.
We did find our hose outlet was moved without our knowledge to the rear of the house in the middle which was a real eye sore, however the supervisor also advised that this would be recitified and put back to the side of the house.
Supervisor advised that wrapping was to be finished by 9/7/2105. Gyprocking and internals to follow.

Kitchen/Butlers Pantry
 
Hallway to fornt door
 
Front door to Hallway
 
Lounge room
Front
 
 
Dining Room
 

Wrapping, Rough in,Windows and Doors.

25th June
 
This weeks update from the SS wrapping has been completed, rough in, windows and doors to be completed in the next week or so.






 

Roof Started

15th June 2015
 
Our roof was started on Monday and then delayed due to wet weather. Quite a few discrepencies between the SS and CSC in regards to where we are actually at, The SS sent through the below photos and stated still on track for completition 19/06/2015 and scaffolding will come down ready for roughin.



Frames start and finish

3rd June 2015
 
Super excited to see that our frames have started, cannot wait to see them all done ecspecially the 2nd story so we can get a feel for the size.
Our SS sent through the below photos.